Education: Holywell All Through School

Breathing Buildings helped Flintshire County Council design a hybrid ventilation scheme for the whole school. We then worked with Waterman Group, Walsh Integrated Building Services and Galliford Try to deliver the vision.

System description:
Ground and first floors are served with façade systems which also utilise the atrium via cross talk attenuators. The top floor and halls were served via Breathing Buildings’ patented  E-Stack® natural ventilation and mixing units. A full design was carried out to demonstrate compliance with the relevant overheating and air quality criteria.

“It was a pleasure to work with Breathing Buildings. The technical support provided at the design stage was second to none. The supply, installation and commissioning of the equipment was well managed and they reacted to the usual site challenges in a timely and professional manner,” says Lee Macnab, Senior Contracts Manager, Walsh Integrated Building Services Ltd.

Download Case Study


Breathing Buildings